As long as cooler brackets aren't an atrocity to deal with (*cough*dark rock 3*cough and cases have ample room for me to manage cables without taking a "brainstorm moment", 45mins. 1hr20min with software/driver installation and network config. 3hr17mins if initial build includes custom loop (not including tube-forming); priming and pre-flushing is an O.C.D. I've developed.
10 mins to to put the system together on my test bench and begin burn in's and test times to make sure all my parts together worked as ordered. 24 hours later put it all in my case because I always stick with stock settings and air cooling by default. Water cooling is just to much work and none of the current water coolers last half as long as my awesome air cooling systems.
current form;
0 Likes
2 hours. Then a while later I changed around the rad setup and added some different fans.
0 Likes
As long as cooler brackets aren't an atrocity to deal with (*cough*dark rock 3*cough and cases have ample room for me to manage cables without taking a "brainstorm moment", 45mins. 1hr20min with software/driver installation and network config. 3hr17mins if initial build includes custom loop (not including tube-forming); priming and pre-flushing is an O.C.D. I've developed.
0 Likes
A pc build is never really finished....
2 Likes
5. So Incredibly still that i've become invisible
0 Likes
1.5 hours
0 Likes
Ready made for life
0 Likes
1 year just because i was keeping an eye out for the best deals and buying parts one at a time from different vendors across the globe
lol!
1 Like
Ive build some pcs May Last i took 4 hours it was made with used parts tho
1 Like
10 mins to to put the system together on my test bench and begin burn in's and test times to make sure all my parts together worked as ordered. 24 hours later put it all in my case because I always stick with stock settings and air cooling by default. Water cooling is just to much work and none of the current water coolers last half as long as my awesome air cooling systems.
0 Likes